Interactive Demo
Smart Resource Planner
Drag projects onto consultants, watch capacity bars update in real time, and get instant over-allocation warnings — showing how intelligent scheduling removes the spreadsheet chaos.
Projects
0/6 assigned
Avg Utilisation
0%
Over Capacity
0 consultants
Unallocated
6 projects
Project Backlog
6 unassignedCRM Migration
Barclays Wealth
Project· 20h/wk
AI Automation PoC
NHS England
Discovery· 15h/wk
Power Platform Build
Rolls-Royce
Project· 25h/wk
Data Strategy Review
M&S
Consultancy· 10h/wk
Azure AI Implementation
Vodafone
Project· 30h/wk
BI Dashboard Suite
Deloitte
Project· 18h/wk
Consultant Availability
AO
Aisha Okonkwo0%
Lead Consultant
0h / 40h per week40h remaining
No projects assigned — drag here to assign
Power PlatformAzure AICRM
BF
Ben Fitzgerald0%
Senior Developer
0h / 40h per week40h remaining
No projects assigned — drag here to assign
AzureReactAPIs
CM
Clara Mensah0%
Data Engineer
0h / 40h per week40h remaining
No projects assigned — drag here to assign
Power BISQLDataverse
DP
David Prentice0%
AI Specialist
0h / 32h per week32h remaining
No projects assigned — drag here to assign
Azure AICopilot StudioML
EV
Elena Vasquez0%
Business Analyst
0h / 40h per week40h remaining
No projects assigned — drag here to assign
Process DesignRequirementsPower Apps
FH
Felix Hartmann0%
Junior Consultant
0h / 40h per week40h remaining
No projects assigned — drag here to assign
Power AutomateSharePointM365
Drag projects from the backlog onto consultants to assign · Click ✕ on a project tag to unassign